Basin Installation

PROCESS

  1. Top of the underground storage basin lined with woven geotextile fabric. Woven geotextile fabric overlaps of a minimum 16 inches.
  2. 12’’ of soil backfill to follow.
  3. Contractor will then stabilize and vegetate the underground basin area.